{"id":1867,"date":"2012-03-23T15:48:56","date_gmt":"2012-03-23T20:48:56","guid":{"rendered":"http:\/\/www.livingreliability.com\/en\/?p=1867"},"modified":"2025-11-06T05:51:51","modified_gmt":"2025-11-06T10:51:51","slug":"lrcm-justification-template","status":"publish","type":"post","link":"https:\/\/www.livingreliability.com\/en\/posts\/lrcm-justification-template\/","title":{"rendered":"LRCM Justification Template"},"content":{"rendered":"<p>Justifying an aggressive project in maintenance is always a challenge. The difficulty lies in the unclear relationship between maintenance activities and their quantifiable effectiveness with regard to organizational performance. The LRCM \/ EXAKT system provides the means to establish such a mathematical relationship. However, until such a system is in place we need to use softer techniques for estimating Return on Investment (ROI) of a proposed project. The following spreadsheet can be used as \u00a0a template for \u00a0a estimating the ROI of a proposed LRCM \/ EXAKT project. Please customize the spreadsheet by entering values and factors that are reasonable in the context of your operational and maintenance facility.<br \/>\n<!--more--><\/p>\n<p><iframe loading=\"lazy\" src=\"https:\/\/r.office.microsoft.com\/r\/rlidExcelEmbed?su=5575101447761127342&amp;Fi=SD4D5EBD3A849167AE!118&amp;ak=t%3d0%26s%3d0%26v%3d!AOFPh3lNjnS-GZM&amp;kip=1&amp;wdAllowInteractivity=False&amp;AllowTyping=True&amp;wdHideGridlines=True&amp;wdHideHeaders=True&amp;wdDownloadButton=True\" frameborder=\"0\" scrolling=\"no\" width=\"675\" height=\"500\"><\/iframe><\/p>\n<p>A <a title=\"Measuring CBM Effectiveness\" href=\"http:\/\/www.livingreliability.com\/en\/posts\/measuring-cbm-effectiveness\/\" target=\"_blank\">rigorous method<\/a> of assessing changes in Condition Based Maintenance procedures will become available to you once you adopt LRCM techniques for the \u00a0development of optimized maintenance decision models.<\/p>\n\n","protected":false},"excerpt":{"rendered":"<p>Justifying an aggressive project in maintenance is always a challenge. The difficulty lies in the unclear relationship between maintenance activities and their quantifiable effectiveness with regard to organizational performance. The LRCM \/ EXAKT system provides the means to establish such a mathematical relationship. However, until such a system is in place we need to use [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[87],"tags":[],"class_list":["post-1867","post","type-post","status-publish","format-standard","hentry","category-managing-lrcm"],"_links":{"self":[{"href":"https:\/\/www.livingreliability.com\/en\/wp-json\/wp\/v2\/posts\/1867","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.livingreliability.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.livingreliability.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.livingreliability.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.livingreliability.com\/en\/wp-json\/wp\/v2\/comments?post=1867"}],"version-history":[{"count":1,"href":"https:\/\/www.livingreliability.com\/en\/wp-json\/wp\/v2\/posts\/1867\/revisions"}],"predecessor-version":[{"id":8734,"href":"https:\/\/www.livingreliability.com\/en\/wp-json\/wp\/v2\/posts\/1867\/revisions\/8734"}],"wp:attachment":[{"href":"https:\/\/www.livingreliability.com\/en\/wp-json\/wp\/v2\/media?parent=1867"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.livingreliability.com\/en\/wp-json\/wp\/v2\/categories?post=1867"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.livingreliability.com\/en\/wp-json\/wp\/v2\/tags?post=1867"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}